Its lone management facility in Sector 80 processes — turns debris into usable sand and gravel that is recognised as a good substitute for natural sand in concrete mix — about 400 to 500 tonnes brought to it.
Source link
Noida residents struggles with construction waste as traffic increases
![](https://realtybeat.werealtors.co/ca/wp-content/uploads/sites/5/2024/09/noida-residents-struggles-with-construction-waste-as-traffic-increases-1024x653.jpg)